MALCO - Captive Power Plant
  • MALCO started operation of 75 MW Coal based Power plant in May 1999
  • MALCO commissioned the project with the lowest gestation period of 20 months.
  • The technology and equipments are supplied by the Shanghai Electric Co. Ltd., China.
  • MALCO imports about 370,000 MTPA of high Calorific value Low ash content coal.
  • MALCO CPP is considered to be one of the highly energy efficient units of the country and has been awarded as the best energy efficient Captive Power Plant by CII.
  • MALCO CPP is consistently generating power at high PLFs of 116%.

 

   